Beneteau Oceanis 411

Work Done

Full standing rigging replacement including the through deck fittings. This required extreme care whilst removing paneling from the  saloon, and forward cabins.


All rigging including the 12mm wire was swaged inhouse, and materials accounted for from the receipt of raw material, throughout the manufacturing process, and onto the mast.


We also installed 3 new halyards, which really brightened up the foredeck.


Upon completion we ensure the boat was left in a neat and tidy condition, and that the through deck fittings were water tight.